
Before packing, floor and wall tiles for a project are laid out on our factory floor in the same order as the installation drawing. This dry lay lets us, and the client, check colour, vein direction and matching across the whole area.
Pieces that do not fit the overall look are replaced at this stage, not on site. Each piece is then numbered to the drawing and packed in order, so the installer can lay the stone quickly and as planned.